EVBatteryRecycling
Vehicle segment

Electric Bus Battery Recycling

Crane-assisted removal, heavy-crate transport, string-level grading and recycling for roof- and floor-mounted electric bus battery systems.

Calculate pack value
Removing a bus EV battery pack for recycling

Facilities

38

Annual capacity

735,500 TPA

Cities covered

117

Quote turnaround

48 hrs

Scope

What the programme covers

01

Roof and floor systems

Removal plans cover roof-mounted strings lifted by crane and floor packs dropped on gantries.

02

String-level isolation

Each pack string is isolated, measured and labelled against the bus fleet number.

03

Heavy-crate transport

Packs move as individual crates on flatbed or curtain-side trailers with engineered restraint.

04

Second-life at scale

Uniform bus packs make well-matched storage strings, which lifts second-life value.

05

Depot scheduling

Work is planned around depot operating hours so service is not disrupted.

06

Transit authority reporting

Certificates and chain-of-custody records are formatted for public-sector audit requirements.

Workflow

From declaration to certificate

  1. 1

    Survey the depot

    Confirm crane or gantry access, lifting frames and a safe isolation area.

  2. 2

    Isolate each string

    Record voltage and serials per string against the bus number.

  3. 3

    Lift and crate

    Packs are lifted one string at a time and crated for heavy transport.

  4. 4

    Grade and route

    Uniform strings are graded for second life; the rest are refined.

Specification

At a glance

ParameterDetail
Typical system180–400 kWh, 580–650 V
HandlingCrane or gantry, heavy crates
Common chemistryLFP
CollectionFull trailer per depot visit
Electric Bus Battery Recycling — key parameters.
Packs

Bus packs we handle

Pack data, grading curves and recovery estimates for each model.

Direct answers

Frequently asked questions

How long does it take to remove a bus battery system?

Typically a few hours per bus once lifting equipment is in place, planned around depot operating hours.

Are bus batteries good for second life?

Often, yes. Uniform LFP strings from the same fleet match well for stationary storage.

Do you need our lifting equipment?

We bring crane capacity where needed, but OEM lifting frames are usually required and should be available on site.

Ready to move packs?

Share volumes, chemistry and condition. A binding quote with logistics and paperwork follows within 48 hours.