EVBatteryRecycling
Second-Life BESS WorksIndia · 20.93 N, 78.94 E

Nagpur — Butibori Second-Life Works

Butibori, Maharashtra facility: second-life works rebuilding graded modules into warrantied stationary storage systems. Rated at 9,500 tonnes per annum and operating since 2023.

+91 96731 98867
Industrial and EV landscape in Maharashtra

Annual capacity

9,500 TPA

Operating lines

3

Cities collected

0

In operation since

2023

The site

About the Butibori, Maharashtra facility

Butibori MIDC, south of Nagpur, is one of Maharashtra's largest industrial areas and sits near the geographic centre of India, on major road and rail routes in every direction. The second-life works opened there in 2023 to turn graded modules into stationary storage systems for commercial, telecom and rural customers across the country. Buyers range from small businesses to telecom tower operators and rural cooperatives.

Rated at 9,500 TPA, the works receives graded modules rather than whole packs. Its central location lets it draw Grade A and B modules from grading sites all over India and ship finished storage units nationwide on reasonable transit times. Much of its output uses LFP modules, whose long calendar life suits repeated daily cycling in stationary duty. Buyers can inspect units before dispatch.

What arrives at the gate

Grade A modules from Indian grading sitesGrade B modules for lower-duty storageMatched LFP modules for long-life systemsReturned storage units for refurbishment
Capabilities

What sets this site apart

01

National distribution

Nagpur's central location keeps delivery times reasonable to most of India.

02

Module matching

Modules are grouped by capacity and impedance so strings age evenly in service.

03

Backup and off-grid systems

Builds systems suited to telecom backup, solar buffering and rural supply.

On site

What happens to material here

Second-life battery storage containers outside an assembly worksTechnicians building second-life battery storage racksCommissioning a second-life battery storage system
  1. 1

    Module matching

    Graded modules are grouped by capacity, impedance and thermal behaviour so strings age evenly.

  2. 2

    Restringing & BMS retrofit

    Matched modules are rebuilt into racks with a new battery management system, fusing and contactors.

  3. 3

    Enclosure integration

    Racks are installed in fire-rated containers with HVAC, aerosol suppression and gas detection.

  4. 4

    Commissioning cycles

    Full charge-discharge commissioning validates round-trip efficiency, SOC accuracy and protection trips.

  5. 5

    Warranty registration

    Each unit ships with a 5-year performance warranty and remote telemetry for state-of-health tracking.

Network

Where material goes next

RoleFacilityDistance
Cell Grading & DiagnosticsIndore — Pithampur Grading Plant385 km
Hydrometallurgical RefineryVisakhapatnam — Atchutapuram Refinery558 km
Integrated Recovery CampusHyderabad — Zaheerabad Recovery Campus387 km
Nearest specialist facilities to Butibori, Maharashtra (straight-line distance).

Local rules

Battery Waste Management Rules 2022 (BWMR) · Central Pollution Control Board (CPCB) and State Pollution Control Boards

The works operates under Maharashtra Pollution Control Board consent. Repurposed storage systems are built to applicable Indian electrical and safety requirements, and the provenance of every module is recorded so each system can be traced back to its source packs.

Booking

Before you book into Butibori, Maharashtra

  • Whole packs are not accepted; modules must arrive already graded.
  • Each module needs its grade report and serial number.
  • Finished units are dispatched on scheduled delivery runs agreed with the buyer.
  • Buyers can inspect systems before dispatch by appointment.

Reverse logistics

Book a slot at Butibori, Maharashtra

The Butibori, Maharashtra despatch desk confirms your pickup window within one working day and ships UN-approved packaging before collection.

Reply within one working day.

Damaged or defective packs are handled under a separate quarantine protocol — flag them in the form and the team calls you back the same day.

FAQ

Butibori, Maharashtra site: common questions

Can I send whole packs to Butibori?

No. The works uses graded modules supplied by the network's grading sites.

What systems are built here?

Stationary storage units for backup power, solar buffering, telecom sites and rural supply.

What are the opening hours at Butibori, Maharashtra?

Monday to Friday 08:00 – 20:00, Saturday 08:00 – 16:00. Sunday: emergency and damaged-pack intake only, by prior booking.

How do I book a collection into Butibori, Maharashtra?

Use the booking button on this page with pack counts, chemistry and condition. The despatch desk confirms a window within one working day and ships UN-approved packaging before collection.