Second-life stagePassenger · NMC 811 (2170)

Kia EV6 GT-Line battery recycling in Butibori, Maharashtra

Butibori, Maharashtra receives graded Kia EV6 GT-Line modules that passed as grade A or B and rebuilds them into warrantied stationary storage.

Pack value at 80% SOH

3,628 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

9,500 TPA

Second-Life BESS Works

Cities served

0

From Butibori, Maharashtra

Kia EV6 GT-Line pack data
Route

Where a Kia EV6 GT-Line pack goes from Butibori, Maharashtra

  1. 1

    Collected via Zaheerabad, Telangana

    Whole packs enter the network at Hyderabad — Zaheerabad Recovery Campus, 387 km away, where they are weighed and de-energised.

  2. 2

    Graded at Pithampur, Madhya Pradesh

    Modules travel 385 km to Indore — Pithampur Grading Plant for capacity, resistance and impedance testing across all 32 modules.

  3. 3

    Second-life build at Butibori, Maharashtra

    Grade A and B modules — about 47% of a pack at 80% SOH — are matched and rebuilt into storage systems on site.

  4. 4

    Refined at Atchutapuram, Andhra Pradesh

    Remaining modules are shredded to black mass and refined at Visakhapatnam — Atchutapuram Refinery, 558 km away.

StageFacilityDistance
Nearest intake yardHyderabad — Zaheerabad Recovery Campus387 km
Nearest grading benchIndore — Pithampur Grading Plant385 km
Nearest refineryVisakhapatnam — Atchutapuram Refinery558 km
Straight-line distances from Butibori, Maharashtra to the next facilities in the network.

Faster option

The closest direct intake sites for Kia EV6 GT-Line packs are Zaheerabad, Telangana (387 km) and Chakan, Maharashtra (583 km).
The pack

Inside the Kia EV6 GT-Line battery

The Kia EV6 GT-Line (2022) carries a 77.4 kWh NMC 811 Cylindrical 2170 pack with 32 modules at 697 V, weighing roughly 433 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.

Service yearSOHGradeValue
Year 294.3%A — BESS readyUSD 4,828
Year 490%A — BESS readyUSD 4,636
Year 685.7%A — BESS readyUSD 4,357
Year 881.4%B — Second lifeUSD 3,791
Year 1077.1%B — Second lifeUSD 3,325
Modelled state of health and residual value for the Kia EV6 GT-Line pack.
NMC 811 (2170)

What the chemistry means here

01

How it ages

NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.

02

Thermal behaviour

High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.

Handling NMC 811 (2170)

Cylindrical modules are dense and often liquid-cooled: drain and cap coolant lines, check for coolant ingress, and keep modules below 30% state of charge for storage and transport.
Passenger handling

Collecting a Kia EV6 GT-Line pack

77.4 kWh, 32 modules, about 433 kg — this is how the Butibori, Maharashtra team plans the job.

Removing a passenger EV battery pack for recycling
01

Removal

Packs are dropped on a vehicle lift using the OEM procedure and a rated battery table, then isolated at the service disconnect.

02

Packaging

One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed.

03

Consolidation

Dealer and workshop returns are consolidated into full truckloads, typically eight or more packs per run.

Before the truck arrives

  • Pull the service disconnect and record pack voltage
  • Drain or cap coolant lines before lifting
  • Photograph the pack casing and any impact damage
  • Keep the VIN and pack serial together on the manifest

Butibori, Maharashtra site notes

  • Whole packs are not accepted; modules must arrive already graded.
  • Each module needs its grade report and serial number.
  • Finished units are dispatched on scheduled delivery runs agreed with the buyer.
  • Buyers can inspect systems before dispatch by appointment.
Recovery

What this pack yields

lithium

4.4 kg

nickel

28.43 kg

cobalt

3.52 kg

manganese

3.27 kg

copper

14.09 kg

aluminium

11.83 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in India

Battery Waste Management Rules 2022 (BWMR)

Regulator: Central Pollution Control Board (CPCB) and State Pollution Control Boards

The works operates under Maharashtra Pollution Control Board consent. Repurposed storage systems are built to applicable Indian electrical and safety requirements, and the provenance of every module is recorded so each system can be traced back to its source packs.

FAQ

Kia EV6 GT-Line in Butibori, Maharashtra: common questions

Can I drop off a Kia EV6 GT-Line battery at Butibori, Maharashtra?

Butibori, Maharashtra is a second-life bess works and does not accept whole packs from customers. Book a collection and the pack enters the network at Zaheerabad, Telangana, 387 km away.

What happens to Kia EV6 GT-Line modules after Butibori, Maharashtra?

Collected via Zaheerabad, Telangana, then Graded at Pithampur, Madhya Pradesh, then Second-life build at Butibori, Maharashtra, then Refined at Atchutapuram, Andhra Pradesh. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Kia EV6 GT-Line pack be prepared for pickup?

Pull the service disconnect and record pack voltage. Drain or cap coolant lines before lifting. Photograph the pack casing and any impact damage. Keep the VIN and pack serial together on the manifest.

Which rules apply to Kia EV6 GT-Line recycling in India?

Battery Waste Management Rules 2022 (BWMR), overseen by Central Pollution Control Board (CPCB) and State Pollution Control Boards. Retired packs move as hazardous goods by road under central motor vehicle rules, and export needs Basel-compliant permissions.

Retiring Kia EV6 GT-Line packs near Butibori, Maharashtra?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.