Kia EV6 GT-Line battery recycling in Zaheerabad, Telangana
Hyderabad — Zaheerabad Recovery Campus takes whole Kia EV6 GT-Line packs straight from fleets, dealers and workshops. Packs are weighed, de-energised and logged here before modules move on for grading or refining.
Pack value at 80% SOH
3,628 USD
Hybrid Split
Second-life share
47%
At 80% SOH
Site capacity
17,000 TPA
Integrated Recovery Campus
Cities served
0
From Zaheerabad, Telangana
Where a Kia EV6 GT-Line pack goes from Zaheerabad, Telangana
- 1
Intake at Zaheerabad, Telangana
One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed. Each pack is weighed, photographed and discharged below 30% state of charge.
- 2
Graded at Hosur, Tamil Nadu
Modules travel 550 km to Bengaluru — Hosur Diagnostics Centre for capacity, resistance and impedance testing across all 32 modules.
- 3
Second life at Butibori, Maharashtra
At 80% SOH about 47% of the pack qualifies for reuse and goes to Nagpur — Butibori Second-Life Works (387 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.
- 4
Refined at Atchutapuram, Andhra Pradesh
Remaining modules are shredded to black mass and refined at Visakhapatnam — Atchutapuram Refinery, 558 km away.
| Stage | Facility | Distance |
|---|---|---|
| Nearest grading bench | Bengaluru — Hosur Diagnostics Centre | 550 km |
| Nearest second-life works | Nagpur — Butibori Second-Life Works | 387 km |
| Nearest refinery | Visakhapatnam — Atchutapuram Refinery | 558 km |
Inside the Kia EV6 GT-Line battery
The Kia EV6 GT-Line (2022) carries a 77.4 kWh NMC 811 Cylindrical 2170 pack with 32 modules at 697 V, weighing roughly 433 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 94.3% | A — BESS ready | USD 4,828 |
| Year 4 | 90% | A — BESS ready | USD 4,636 |
| Year 6 | 85.7% | A — BESS ready | USD 4,357 |
| Year 8 | 81.4% | B — Second life | USD 3,791 |
| Year 10 | 77.1% | B — Second life | USD 3,325 |
What the chemistry means here
How it ages
NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.
Thermal behaviour
High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.
Handling NMC 811 (2170)
Collecting a Kia EV6 GT-Line pack
77.4 kWh, 32 modules, about 433 kg — this is how the Zaheerabad, Telangana team plans the job.

Removal
Packs are dropped on a vehicle lift using the OEM procedure and a rated battery table, then isolated at the service disconnect.
Packaging
One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed.
Consolidation
Dealer and workshop returns are consolidated into full truckloads, typically eight or more packs per run.
Before the truck arrives
- Pull the service disconnect and record pack voltage
- Drain or cap coolant lines before lifting
- Photograph the pack casing and any impact damage
- Keep the VIN and pack serial together on the manifest
Zaheerabad, Telangana site notes
- Bus packs require advance notice so lifting equipment and a trained crew are scheduled.
- Share pack drawings or architecture notes for unfamiliar commercial formats before collection.
- Hyderabad fleet depots can book recurring scheduled collections.
- Damaged units are received in a dedicated quarantine building away from the main floor.
What this pack yields
lithium
4.4 kg
nickel
28.43 kg
cobalt
3.52 kg
manganese
3.27 kg
copper
14.09 kg
aluminium
11.83 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in India
Battery Waste Management Rules 2022 (BWMR)
Regulator: Central Pollution Control Board (CPCB) and State Pollution Control Boards
The campus operates under Telangana State Pollution Control Board consent within the Zaheerabad NIMZ, with conditions covering shredding, dust control and fire safety. It issues recovery evidence for producers registered under the Battery Waste Management Rules 2022.
Kia EV6 GT-Line in Zaheerabad, Telangana: common questions
Can I drop off a Kia EV6 GT-Line battery at Zaheerabad, Telangana?
Yes, by appointment. Hyderabad — Zaheerabad Recovery Campus accepts whole Kia EV6 GT-Line packs; book a collection or a drop-off slot so the site can prepare packaging and paperwork.
What happens to Kia EV6 GT-Line modules after Zaheerabad, Telangana?
Intake at Zaheerabad, Telangana, then Graded at Hosur, Tamil Nadu, then Second life at Butibori, Maharashtra, then Refined at Atchutapuram, Andhra Pradesh. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.
How should a Kia EV6 GT-Line pack be prepared for pickup?
Pull the service disconnect and record pack voltage. Drain or cap coolant lines before lifting. Photograph the pack casing and any impact damage. Keep the VIN and pack serial together on the manifest.
Which rules apply to Kia EV6 GT-Line recycling in India?
Battery Waste Management Rules 2022 (BWMR), overseen by Central Pollution Control Board (CPCB) and State Pollution Control Boards. Retired packs move as hazardous goods by road under central motor vehicle rules, and export needs Basel-compliant permissions.
Kia EV6 GT-Line at other sites
Other passenger packs at Zaheerabad, Telangana
Retiring Kia EV6 GT-Line packs near Zaheerabad, Telangana?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
