Inside Our Fremont, California Battery Recycling Hub

24,000 tonnes per annum of lithium-ion processing capacity, line by line.

ML

Marcus Lindqvist

Director of Hydrometallurgy

3 min read Updated 2026-07-11
Conveyor carrying separated copper and aluminium foil fragments under bright inspection light

The short answer

The Fremont, California site is a cell grading & diagnostics processing up to 24,000 tonnes a year across module soh bench, eis diagnostics laboratory, ai optical cell grading. It has operated since 2020 and typically receives passenger-car packs from california's large ev fleet and pilot-line and r&d material from bay area companies.

On this page6 sections

Key takeaways

  1. 124,000 TPA cell grading & diagnostics, operating since 2020.
  2. 2Main feedstock: passenger-car packs from california's large ev fleet, pilot-line and r&d material from bay area companies, ride-hailing and delivery fleet retirements.
  3. 3Holds R2v3, ISO 14001, ISO 45001.
  4. 4Black mass goes to Reno, Nevada, about 291 km away.
01

What the site does

Fremont sits in the southern East Bay, part of a Bay Area cluster that combines vehicle production, battery start-ups and energy storage developers. The diagnostics works opened on Fremont Boulevard in 2020 to grade packs from California, the largest EV market in the United States, where many of the earliest mass-market electric cars are now reaching the end of their road life.

With 24,000 TPA of capacity, the works tests large volumes of passenger-car packs from dismantlers, dealers and fleets. Its location also suits pilot-line and R&D material from Bay Area companies developing new cells and packs, while Grade A modules find a ready market in California's strong demand for energy storage. Dismantlers are a large and steady source of the site's intake, bringing packs already removed from vehicles.

02

What arrives at the gate

Feedstock at Fremont, California reflects its catchment and plant type. Every consignment is weighed, photographed and logged against the originating manifest before it enters the process area.

  • Passenger-car packs from California's large EV fleet
  • Pilot-line and R&D material from Bay Area companies
  • Ride-hailing and delivery fleet retirements
  • Packs removed from vehicles at licensed dismantlers
03

The process, step by step

The 3 operating lines — module soh bench, eis diagnostics laboratory, ai optical cell grading — run the sequence below.

StageWhat happens
Intake & safety triagePacks are logged, thermally imaged and screened for swelling, coolant ingress or venting before entering the bench area.
Controlled de-energisingResidual energy is discharged to a safe state of charge with regenerative load banks and recorded per serial number.
Module-level capacity testFull charge-discharge cycling at C/3 establishes usable capacity, internal resistance and cell-to-cell balance.
EIS fingerprinting1 mHz–10 kHz impedance sweeps separate SEI growth, lithium plating and contact resistance degradation modes.
AI optical inspectionMachine-vision inspection of busbars, welds and cell cans flags mechanical defects that block second-life reuse.
Grade assignmentGrade A (≥85% SOH), B (75–85%), C (65–75%) and D routes are assigned, with D-grade material released to refining.
Process sequence at the Fremont, California cell grading & diagnostics.
04

What sets the site apart

Largest US EV market. Serves California, where many of the first mass-market EVs are now retiring.

R&D material handling. Accepts experimental cells and packs from local technology developers.

Storage-market supply. Grade A modules feed California's strong demand for energy storage.

05

Where material goes next

Material that Fremont, California does not finish on site moves to the nearest specialist facility in the network, keeping transport distances and dwell times down.

FacilityRoleDistance
Gothenburg — Nordic Second-Life CampusSecond-Life BESS Works8,586 km
Reno — Nevada Hydrometallurgy RefineryHydrometallurgical Refinery291 km
Onward routing from Fremont, California (straight-line distance).

Field note

Experimental cells must be declared with chemistry and any known hazards.
Questions

Frequently asked questions

Does Fremont accept prototype cells?

Yes, with a declaration of chemistry and known hazards so they can be handled safely.

Why is Fremont's documentation so detailed?

California applies demanding hazardous-waste rules, so complete records are kept for every consignment.

Do you collect small volumes near Fremont, California?

Yes, though consolidated pickups of eight or more packs give better per-unit logistics economics. Workshops with occasional single packs are pooled into a scheduled regional milk run.