Ola Electric S1 Pro Gen 2 battery recycling in Lyon, France
Lyon, France does not take whole packs. It receives black mass made from Ola Electric S1 Pro Gen 2 modules that failed grading, and turns it into battery-grade salts.
Pack value at 80% SOH
187 USD
Hybrid Split
Second-life share
47%
At 80% SOH
Site capacity
23,000 TPA
Hydrometallurgical Refinery
Cities served
3
From Lyon, France
Where a Ola Electric S1 Pro Gen 2 pack goes from Lyon, France
- 1
Collected via Dubai, UAE
Whole packs enter the network at Dubai — Jebel Ali Logistics Yard, 5,003 km away, where they are weighed and de-energised.
- 2
Graded at Stuttgart, Germany
Modules travel 469 km to Stuttgart — Baden-Wurttemberg Grading Works for capacity, resistance and impedance testing across all 2 modules.
- 3
Second life at Zwickau, Saxony
At 80% SOH about 47% of the pack qualifies for reuse and goes to Zwickau — Saxony Second-Life Works (790 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.
- 4
Refining at Lyon, France
Black mass from failed modules is leached and refined here into battery-grade nickel, cobalt and lithium salts.
| Stage | Facility | Distance |
|---|---|---|
| Nearest intake yard | Dubai — Jebel Ali Logistics Yard | 5,003 km |
| Nearest grading bench | Stuttgart — Baden-Wurttemberg Grading Works | 469 km |
| Nearest second-life works | Zwickau — Saxony Second-Life Works | 790 km |
Faster option
Inside the Ola Electric S1 Pro Gen 2 battery
The Ola Electric S1 Pro Gen 2 (2023) carries a 4 kWh NMC 811 Cylindrical 2170 pack with 2 modules at 48 V, weighing roughly 22 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 94.5% | A — BESS ready | USD 250 |
| Year 4 | 90.2% | A — BESS ready | USD 240 |
| Year 6 | 85.9% | A — BESS ready | USD 227 |
| Year 8 | 81.6% | B — Second life | USD 197 |
| Year 10 | 77.3% | B — Second life | USD 173 |
What the chemistry means here
How it ages
NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.
Thermal behaviour
High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.
Handling NMC 811 (2170)
Collecting a Ola Electric S1 Pro Gen 2 pack
4 kWh, 2 modules, about 22 kg — this is how the Lyon, France team plans the job.

Removal
Removable packs are unclipped by hand; fixed packs are removed at the dealer bench with the frame supported.
Packaging
Packs travel in UN-approved steel or plastic cages with non-conductive dividers, typically dozens per cage.
Consolidation
Dealer and swap-station returns are aggregated at a single point so one collection clears many units.
Before the truck arrives
- Tape terminals and connectors on every pack
- Separate swollen or dropped packs into their own container
- Record serials in a single list per cage
- Store below 30% charge away from charging racks
Lyon, France site notes
- Only black mass and scrap are accepted.
- Cross-border shipments need prior documentation.
- Bulk bags must be sealed and labelled.
- Settlement follows assay at intake.
What this pack yields
lithium
0.23 kg
nickel
1.47 kg
cobalt
0.18 kg
manganese
0.17 kg
copper
0.73 kg
aluminium
0.61 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in France
EU Battery Regulation (EU) 2023/1542 and the French EPR (REP) system
Regulator: Ministry for Ecological Transition, with ADEME overseeing producer responsibility schemes
The refinery operates under French permitting for classified installations (ICPE) and the EU Battery Regulation (EU) 2023/1542. Waste shipments follow the EU Waste Shipment Regulation.
Ola Electric S1 Pro Gen 2 in Lyon, France: common questions
Can I drop off a Ola Electric S1 Pro Gen 2 battery at Lyon, France?
Lyon, France is a hydrometallurgical refinery and does not accept whole packs from customers. Book a collection and the pack enters the network at Dubai, UAE, 5,003 km away.
What happens to Ola Electric S1 Pro Gen 2 modules after Lyon, France?
Collected via Dubai, UAE, then Graded at Stuttgart, Germany, then Second life at Zwickau, Saxony, then Refining at Lyon, France. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.
How should a Ola Electric S1 Pro Gen 2 pack be prepared for pickup?
Tape terminals and connectors on every pack. Separate swollen or dropped packs into their own container. Record serials in a single list per cage. Store below 30% charge away from charging racks.
Which rules apply to Ola Electric S1 Pro Gen 2 recycling in France?
EU Battery Regulation (EU) 2023/1542 and the French EPR (REP) system, overseen by Ministry for Ecological Transition, with ADEME overseeing producer responsibility schemes. Road transport follows ADR, and cross-border shipments follow the EU Waste Shipment Regulation.
Cities collected by Lyon, France
Ola Electric S1 Pro Gen 2 at other sites
Other two-wheeler packs at Lyon, France
Retiring Ola Electric S1 Pro Gen 2 packs near Lyon, France?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
