EVBatteryRecycling
Second-life stageThree-Wheeler · LMO Pouch

Mahindra Treo Auto battery recycling in Mandi Gobindgarh, Punjab

Mandi Gobindgarh, Punjab receives graded Mahindra Treo Auto modules that passed as grade A or B and rebuilds them into warrantied stationary storage.

Pack value at 80% SOH

215 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

7,500 TPA

Second-Life BESS Works

Cities served

0

From Mandi Gobindgarh, Punjab

Mahindra Treo Auto pack data
Route

Where a Mahindra Treo Auto pack goes from Mandi Gobindgarh, Punjab

  1. 1

    Collected via Narela, Delhi

    Whole packs enter the network at Delhi — Narela Collection Yard, 257 km away, where they are weighed and de-energised.

  2. 2

    Graded at Gurugram, Haryana

    Modules travel 298 km to NCR — Gurugram Collection & Grading Hub for capacity, resistance and impedance testing across all 4 modules.

  3. 3

    Second-life build at Mandi Gobindgarh, Punjab

    Grade A and B modules — about 47% of a pack at 80% SOH — are matched and rebuilt into storage systems on site.

  4. 4

    Refined at Haldia, West Bengal

    Remaining modules are shredded to black mass and refined at Kolkata — Haldia Refining Works, 1,564 km away.

StageFacilityDistance
Nearest intake yardDelhi — Narela Collection Yard257 km
Nearest grading benchNCR — Gurugram Collection & Grading Hub298 km
Nearest refineryKolkata — Haldia Refining Works1,564 km
Straight-line distances from Mandi Gobindgarh, Punjab to the next facilities in the network.

Faster option

The closest direct intake sites for Mahindra Treo Auto packs are Narela, Delhi (257 km) and Unnao, Uttar Pradesh (662 km).
The pack

Inside the Mahindra Treo Auto battery

The Mahindra Treo Auto (2019) carries a 7.37 kWh LMO / LMO-NMC Pouch pack with 4 modules at 48 V, weighing roughly 60 kg. Legacy manganese-rich pouch packs common in early two- and three-wheeler fleets across South Asia.

Service yearSOHGradeValue
Year 294.3%A — BESS readyUSD 264
Year 490%A — BESS readyUSD 254
Year 685.7%A — BESS readyUSD 241
Year 881.4%B — Second lifeUSD 221
Year 1077.1%B — Second lifeUSD 205
Modelled state of health and residual value for the Mahindra Treo Auto pack.
LMO Pouch

What the chemistry means here

01

How it ages

LMO's weak point is manganese dissolution, which speeds up at elevated temperature and damages the anode. Packs that lived in hot climates without active cooling typically fade faster.

02

Thermal behaviour

Manganese spinel is more thermally stable than nickel-rich cathodes, but blended LMO-NMC pouch cells still vent flammable gas when abused, and older packs may have weaker protection electronics.

Handling LMO Pouch

Many LMO packs come from early two- and three-wheelers and informal service channels. Expect missing documentation, check for prior repair and quarantine anything with swelling or corrosion.
Three-Wheeler handling

Collecting a Mahindra Treo Auto pack

7.37 kWh, 4 modules, about 60 kg — this is how the Mandi Gobindgarh, Punjab team plans the job.

Removing a three-wheeler EV battery pack for recycling
01

Removal

Packs are removed from the under-seat or rear bay; high-cycle fleet packs are checked for water ingress first.

02

Packaging

Packs are palletised in small groups inside UN-rated boxes, with dividers between units.

03

Consolidation

Fleet depots and dealer service points are scheduled as recurring milk runs rather than one-off pickups.

Before the truck arrives

  • Check for corrosion and water ingress in the pack bay
  • Flag any aftermarket or repaired packs on the manifest
  • Tape terminals and remove quick-connect plugs
  • Group packs by chemistry before collection

Mandi Gobindgarh, Punjab site notes

  • Only graded modules are accepted.
  • Each module must include its grade report.
  • Delivery of finished systems is scheduled with the customer.
  • Site inspections are available by appointment.
Recovery

What this pack yields

lithium

0.52 kg

nickel

1.11 kg

cobalt

0.16 kg

manganese

3.24 kg

copper

2.04 kg

aluminium

2.29 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in India

Battery Waste Management Rules 2022 (BWMR)

Regulator: Central Pollution Control Board (CPCB) and State Pollution Control Boards

The works operates under Punjab Pollution Control Board consent and builds systems to applicable Indian electrical and safety requirements, with module traceability maintained from source pack to finished unit.

FAQ

Mahindra Treo Auto in Mandi Gobindgarh, Punjab: common questions

Can I drop off a Mahindra Treo Auto battery at Mandi Gobindgarh, Punjab?

Mandi Gobindgarh, Punjab is a second-life bess works and does not accept whole packs from customers. Book a collection and the pack enters the network at Narela, Delhi, 257 km away.

What happens to Mahindra Treo Auto modules after Mandi Gobindgarh, Punjab?

Collected via Narela, Delhi, then Graded at Gurugram, Haryana, then Second-life build at Mandi Gobindgarh, Punjab, then Refined at Haldia, West Bengal. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Mahindra Treo Auto pack be prepared for pickup?

Check for corrosion and water ingress in the pack bay. Flag any aftermarket or repaired packs on the manifest. Tape terminals and remove quick-connect plugs. Group packs by chemistry before collection.

Which rules apply to Mahindra Treo Auto recycling in India?

Battery Waste Management Rules 2022 (BWMR), overseen by Central Pollution Control Board (CPCB) and State Pollution Control Boards. Retired packs move as hazardous goods by road under central motor vehicle rules, and export needs Basel-compliant permissions.

Retiring Mahindra Treo Auto packs near Mandi Gobindgarh, Punjab?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.