Hosur, Tamil Nadu is a diagnostics site: Ford F-150 Lightning ER packs arrive here from intake yards for module-level capacity, resistance and impedance testing, which decides reuse or refining.

Pack value at 80% SOH

6,140 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

14,000 TPA

Cell Grading & Diagnostics

Cities served

9

From Hosur, Tamil Nadu

Ford F-150 Lightning ER pack data
Route

Where a Ford F-150 Lightning ER pack goes from Hosur, Tamil Nadu

  1. 1

    Collected via Zaheerabad, Telangana

    Whole packs enter the network at Hyderabad — Zaheerabad Recovery Campus, 550 km away, where they are weighed and de-energised.

  2. 2

    Module grading at Hosur, Tamil Nadu

    All 16 modules are tested for capacity, DC resistance and impedance, then assigned grade A to D.

  3. 3

    Second life at Butibori, Maharashtra

    At 80% SOH about 47% of the pack qualifies for reuse and goes to Nagpur — Butibori Second-Life Works (918 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.

  4. 4

    Refined at Sriperumbudur, Tamil Nadu

    Remaining modules are shredded to black mass and refined at Chennai — Sriperumbudur Recovery Campus, 230 km away.

StageFacilityDistance
Nearest intake yardHyderabad — Zaheerabad Recovery Campus550 km
Nearest second-life worksNagpur — Butibori Second-Life Works918 km
Nearest refineryChennai — Sriperumbudur Recovery Campus230 km
Straight-line distances from Hosur, Tamil Nadu to the next facilities in the network.

Faster option

The closest direct intake sites for Ford F-150 Lightning ER packs are Dubai, UAE (2,740 km) and Ulsan, South Korea (5,727 km).
The pack

Inside the Ford F-150 Lightning ER battery

The Ford F-150 Lightning ER (2022) carries a 131 kWh NMC 811 Cylindrical 2170 pack with 16 modules at 400 V, weighing roughly 734 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.

Service yearSOHGradeValue
Year 295.6%A — BESS readyUSD 8,271
Year 491.3%A — BESS readyUSD 7,945
Year 687%A — BESS readyUSD 7,619
Year 882.7%B — Second lifeUSD 6,687
Year 1078.4%B — Second lifeUSD 5,847
Modelled state of health and residual value for the Ford F-150 Lightning ER pack.
NMC 811 (2170)

What the chemistry means here

01

How it ages

NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.

02

Thermal behaviour

High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.

Handling NMC 811 (2170)

Cylindrical modules are dense and often liquid-cooled: drain and cap coolant lines, check for coolant ingress, and keep modules below 30% state of charge for storage and transport.
Commercial Fleet handling

Collecting a Ford F-150 Lightning ER pack

131 kWh, 16 modules, about 734 kg — this is how the Hosur, Tamil Nadu team plans the job.

Removing a commercial fleet EV battery pack for recycling
01

Removal

Large packs are removed at the depot with a forklift-rated battery table and the vehicle isolated under lock-out tag-out.

02

Packaging

Each pack travels in a rated crate or on a restrained pallet, with coolant drained and ports sealed.

03

Consolidation

Depot retirements are batched against the fleet replacement schedule so collections line up with vehicle swaps.

Before the truck arrives

  • Share telematics SOH history if it is available
  • Confirm forklift access and dock height at the depot
  • Isolate high-voltage systems under lock-out tag-out
  • Declare any pack involved in a collision

Hosur, Tamil Nadu site notes

  • Box or crate two-wheeler packs individually; loose-stacked packs are repacked on arrival and slow intake.
  • Swap operators can set up recurring weekly collections from Bengaluru depots.
  • Send a serial list with each load so bench results map directly back to your asset records.
  • Packs with visible swelling must be declared and are tested only in the isolated quarantine room.
Recovery

What this pack yields

lithium

7.45 kg

nickel

48.13 kg

cobalt

5.96 kg

manganese

5.54 kg

copper

23.85 kg

aluminium

20.02 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in India

Battery Waste Management Rules 2022 (BWMR)

Regulator: Central Pollution Control Board (CPCB) and State Pollution Control Boards

The centre operates under Tamil Nadu Pollution Control Board consent and grades material for producers registered under the Battery Waste Management Rules 2022. Because much of its intake crosses the state border from Karnataka, interstate transport documentation and waste descriptions are checked at the gate before unloading.

FAQ

Ford F-150 Lightning ER in Hosur, Tamil Nadu: common questions

Can I drop off a Ford F-150 Lightning ER battery at Hosur, Tamil Nadu?

Hosur, Tamil Nadu is a cell grading & diagnostics and does not accept whole packs from customers. Book a collection and the pack enters the network at Zaheerabad, Telangana, 550 km away.

What happens to Ford F-150 Lightning ER modules after Hosur, Tamil Nadu?

Collected via Zaheerabad, Telangana, then Module grading at Hosur, Tamil Nadu, then Second life at Butibori, Maharashtra, then Refined at Sriperumbudur, Tamil Nadu. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Ford F-150 Lightning ER pack be prepared for pickup?

Share telematics SOH history if it is available. Confirm forklift access and dock height at the depot. Isolate high-voltage systems under lock-out tag-out. Declare any pack involved in a collision.

Which rules apply to Ford F-150 Lightning ER recycling in India?

Battery Waste Management Rules 2022 (BWMR), overseen by Central Pollution Control Board (CPCB) and State Pollution Control Boards. Retired packs move as hazardous goods by road under central motor vehicle rules, and export needs Basel-compliant permissions.

Coverage

Cities collected by Hosur, Tamil Nadu

Retiring Ford F-150 Lightning ER packs near Hosur, Tamil Nadu?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.