EVBatteryRecycling
Article · Recycling Process

Inside Our Zaheerabad, Telangana Battery Recycling Hub

17,000 tonnes per annum of lithium-ion processing capacity, line by line.

ML

Marcus Lindqvist

Director of Hydrometallurgy

3 min read Updated 2026-08-10
Close-up of a robotic gripper lifting a battery module out of an opened EV pack

The short answer

The Zaheerabad, Telangana site is a integrated recovery campus processing up to 17,000 tonnes a year across automated disassembly, cell grading & second-life build, black mass production. It has operated since 2021 and typically receives electric bus and commercial vehicle packs and hyderabad fleet and ride-hailing retirements.

On this page6 sections

Key takeaways

  1. 117,000 TPA integrated recovery campus, operating since 2021.
  2. 2Main feedstock: electric bus and commercial vehicle packs, hyderabad fleet and ride-hailing retirements, manufacturing scrap from regional vehicle plants.
  3. 3Holds CPCB Registered, ISO 14001, ISO 45001, R2v3.
  4. 4Black mass goes to Atchutapuram, Andhra Pradesh, about 558 km away.
01

What the site does

Zaheerabad, west of Hyderabad, hosts a node of the National Investment and Manufacturing Zone, and the surrounding area has established vehicle and tractor manufacturing. The recovery campus opened there in 2021 to process material from Telangana, Andhra Pradesh and neighbouring parts of Karnataka and Maharashtra, a region with growing electric bus programmes and commercial vehicle production. Its catchment covers several fast-growing state bus programmes.

As a 17,000 TPA integrated campus, it handles the complete route from intake to black mass on one site. Hyderabad's electric bus and fleet programmes, together with commercial vehicle manufacturing nearby, give the campus a larger share of heavy packs than most Indian sites, so its disassembly bays and lifting equipment are sized for bus and truck battery systems. Smaller packs share the same intake lines.

02

What arrives at the gate

Feedstock at Zaheerabad, Telangana reflects its catchment and plant type. Every consignment is weighed, photographed and logged against the originating manifest before it enters the process area.

  • Electric bus and commercial vehicle packs
  • Hyderabad fleet and ride-hailing retirements
  • Manufacturing scrap from regional vehicle plants
  • Two-wheeler packs from Telangana dealer networks
03

The process, step by step

The 3 operating lines — automated disassembly, cell grading & second-life build, black mass production — run the sequence below.

StageWhat happens
Intake inspectionPacks are logged, thermally scanned and quarantined if damaged, defective or water-exposed.
Safe dischargeResidual energy is recovered to the site microgrid before any mechanical work begins.
Automated disassemblyRobotic cells remove housings, cooling plates and wiring for separate material streams.
Grading splitModules above 75% SOH move to second-life build; everything else is shredded under inert atmosphere.
Black mass productionShredding, drying and multi-stage separation produce a graphite-rich black mass at controlled moisture.
Refining handoverBlack mass is assayed, sealed and shipped to the assigned hydrometallurgical refinery.
Process sequence at the Zaheerabad, Telangana integrated recovery campus.
04

What sets the site apart

Heavy-pack handling. Cranes and disassembly bays sized for bus and truck battery systems weighing several tonnes.

Full on-site route. Grading, disassembly and black mass production all happen on the same campus.

Deccan catchment. Serves Telangana, Andhra Pradesh and nearby districts of Karnataka and Maharashtra.

05

Where material goes next

Material that Zaheerabad, Telangana does not finish on site moves to the nearest specialist facility in the network, keeping transport distances and dwell times down.

FacilityRoleDistance
Bengaluru — Hosur Diagnostics CentreCell Grading & Diagnostics550 km
Nagpur — Butibori Second-Life WorksSecond-Life BESS Works387 km
Visakhapatnam — Atchutapuram RefineryHydrometallurgical Refinery558 km
Onward routing from Zaheerabad, Telangana (straight-line distance).

Field note

Bus packs require advance notice so lifting equipment and a trained crew are scheduled.
Questions

Frequently asked questions

Can Zaheerabad handle electric bus batteries?

Yes. The campus has the lifting equipment and disassembly space needed for large bus and truck packs.

Is black mass made on site?

Yes. Material that fails grading is shredded on campus and sent to a refinery.

Do you collect small volumes near Zaheerabad, Telangana?

Yes, though consolidated pickups of eight or more packs give better per-unit logistics economics. Workshops with occasional single packs are pooled into a scheduled regional milk run.

Turn this into a plan for your packs

Send pack counts, chemistry and approximate state of health. You get an indicative value split, a slotted collection window and pre-filled dangerous goods paperwork.

Run the yield calculator
Keep reading

More on recycling process