Why Shenzhen matters
BYD headquarters and fully electrified public fleet. Active names in and around the city include BYD, Shenzhen Bus Group.
OEM head offices and engineering centres produce prototype and validation packs, recall and warranty returns routed through central teams, and programme fleet retirements. Volumes are lumpy but the packs are often high-value and come with full engineering data.
| Item | Detail |
|---|---|
| Serving site | Ningde — Fujian Refining Base (Hydrometallurgical Refinery) |
| Pickup SLA | 24 hours |
| Coverage radius | 78 km |
| Collection cadence | Called off against a framework agreement |
| Regulatory framework | MIIT management measures for new energy vehicle power battery recycling |
How collection works here
We work under a framework take-back agreement with the OEM's central sustainability or aftersales team, covering pricing methodology, EPR certificate transfer and confidential handling of prototype hardware, including destruction certificates where required.
Loads move in Class 9 compliant transport with pre-filled dangerous goods paperwork to Ningde, Fujian, where they are weighed, logged and graded.
- OEM sustainability and aftersales teams
- Engineering and validation centres
- Programme and demo fleets
- Recall coordination teams
What the rules require in China
China makes carmakers responsible for recovering the power batteries in the vehicles they sell, and each pack is tracked on a national traceability platform from production to recycling. MIIT publishes a list of recyclers that meet its industry standard conditions, and batteries are expected to flow to these firms for cascade use or material recovery.
Road transport of retired power batteries follows national dangerous goods rules, with packaging and labelling set by national standards.
- Register pack codes on the national traceability management platform
- Route retired packs through the automaker's collection network or a listed compliant recycler
- Follow national standards for dismantling, cascade use and material recovery
- Keep records that link each pack's code to its final treatment
Field note
What you get paid and what you file
Settlement is quoted per pack after measured state of health, not by guesswork on age. Modules holding 75% or more of rated capacity settle at second-life rates; the remainder settle against black mass metal content.
Certificates carry achieved recovery percentages and downstream vendor disclosure for reporting under MIIT management measures for new energy vehicle power battery recycling.
