EVBatteryRecycling
Second-life stagePassenger · NMC 811 (2170)

Volkswagen ID.4 Pro battery recycling in Gothenburg, Sweden

Gothenburg, Sweden receives graded Volkswagen ID.4 Pro modules that passed as grade A or B and rebuilds them into warrantied stationary storage.

Pack value at 80% SOH

3,843 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

26,000 TPA

Second-Life BESS Works

Cities served

5

From Gothenburg, Sweden

Volkswagen ID.4 Pro pack data
Route

Where a Volkswagen ID.4 Pro pack goes from Gothenburg, Sweden

  1. 1

    Collected via Dubai, UAE

    Whole packs enter the network at Dubai — Jebel Ali Logistics Yard, 4,962 km away, where they are weighed and de-energised.

  2. 2

    Graded at Warsaw, Mazovia

    Modules travel 838 km to Warsaw — Mazovia Grading Centre for capacity, resistance and impedance testing across all 12 modules.

  3. 3

    Second-life build at Gothenburg, Sweden

    Grade A and B modules — about 47% of a pack at 80% SOH — are matched and rebuilt into storage systems on site.

  4. 4

    Refined at Rotterdam, South Holland

    Remaining modules are shredded to black mass and refined at Rotterdam — Maasvlakte Refining Works, 802 km away.

StageFacilityDistance
Nearest intake yardDubai — Jebel Ali Logistics Yard4,962 km
Nearest grading benchWarsaw — Mazovia Grading Centre838 km
Nearest refineryRotterdam — Maasvlakte Refining Works802 km
Straight-line distances from Gothenburg, Sweden to the next facilities in the network.

Faster option

The closest direct intake sites for Volkswagen ID.4 Pro packs are Dubai, UAE (4,962 km) and Toronto, Ontario (6,109 km).
The pack

Inside the Volkswagen ID.4 Pro battery

The Volkswagen ID.4 Pro (2021) carries a 82 kWh NMC 811 Cylindrical 2170 pack with 12 modules at 400 V, weighing roughly 459 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.

Service yearSOHGradeValue
Year 294.5%A — BESS readyUSD 5,125
Year 490.2%A — BESS readyUSD 4,921
Year 685.9%A — BESS readyUSD 4,646
Year 881.6%B — Second lifeUSD 4,041
Year 1077.3%B — Second lifeUSD 3,543
Modelled state of health and residual value for the Volkswagen ID.4 Pro pack.
NMC 811 (2170)

What the chemistry means here

01

How it ages

NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.

02

Thermal behaviour

High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.

Handling NMC 811 (2170)

Cylindrical modules are dense and often liquid-cooled: drain and cap coolant lines, check for coolant ingress, and keep modules below 30% state of charge for storage and transport.
Passenger handling

Collecting a Volkswagen ID.4 Pro pack

82 kWh, 12 modules, about 459 kg — this is how the Gothenburg, Sweden team plans the job.

Removing a passenger EV battery pack for recycling
01

Removal

Packs are dropped on a vehicle lift using the OEM procedure and a rated battery table, then isolated at the service disconnect.

02

Packaging

One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed.

03

Consolidation

Dealer and workshop returns are consolidated into full truckloads, typically eight or more packs per run.

Before the truck arrives

  • Pull the service disconnect and record pack voltage
  • Drain or cap coolant lines before lifting
  • Photograph the pack casing and any impact damage
  • Keep the VIN and pack serial together on the manifest

Gothenburg, Sweden site notes

  • Only graded modules are accepted.
  • Modules must include grade reports.
  • Finished systems ship by road or sea.
  • Buyer visits can be arranged.
Recovery

What this pack yields

lithium

4.67 kg

nickel

30.12 kg

cobalt

3.73 kg

manganese

3.47 kg

copper

14.93 kg

aluminium

12.53 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in Sweden

EU Battery Regulation (EU) 2023/1542 and the Swedish battery ordinance

Regulator: Swedish Environmental Protection Agency (Naturvardsverket)

The campus operates under Swedish environmental permits and the EU Battery Regulation (EU) 2023/1542, including its rules on repurposed batteries. Systems follow applicable European safety standards.

FAQ

Volkswagen ID.4 Pro in Gothenburg, Sweden: common questions

Can I drop off a Volkswagen ID.4 Pro battery at Gothenburg, Sweden?

Gothenburg, Sweden is a second-life bess works and does not accept whole packs from customers. Book a collection and the pack enters the network at Dubai, UAE, 4,962 km away.

What happens to Volkswagen ID.4 Pro modules after Gothenburg, Sweden?

Collected via Dubai, UAE, then Graded at Warsaw, Mazovia, then Second-life build at Gothenburg, Sweden, then Refined at Rotterdam, South Holland. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Volkswagen ID.4 Pro pack be prepared for pickup?

Pull the service disconnect and record pack voltage. Drain or cap coolant lines before lifting. Photograph the pack casing and any impact damage. Keep the VIN and pack serial together on the manifest.

Which rules apply to Volkswagen ID.4 Pro recycling in Sweden?

EU Battery Regulation (EU) 2023/1542 and the Swedish battery ordinance, overseen by Swedish Environmental Protection Agency (Naturvardsverket). Road transport follows ADR, and cross-border shipments follow the EU Waste Shipment Regulation.

Coverage

Cities collected by Gothenburg, Sweden

Retiring Volkswagen ID.4 Pro packs near Gothenburg, Sweden?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.