Olectra K9 Electric Bus battery recycling in Gothenburg, Sweden
Gothenburg, Sweden receives graded Olectra K9 Electric Bus modules that passed as grade A or B and rebuilds them into warrantied stationary storage.
Pack value at 80% SOH
10,377 USD
Hybrid Split
Second-life share
56%
At 80% SOH
Site capacity
26,000 TPA
Second-Life BESS Works
Cities served
5
From Gothenburg, Sweden
Where a Olectra K9 Electric Bus pack goes from Gothenburg, Sweden
- 1
Collected via Dubai, UAE
Whole packs enter the network at Dubai — Jebel Ali Logistics Yard, 4,962 km away, where they are weighed and de-energised.
- 2
Graded at Warsaw, Mazovia
Modules travel 838 km to Warsaw — Mazovia Grading Centre for capacity, resistance and impedance testing across all 22 modules.
- 3
Second-life build at Gothenburg, Sweden
Grade A and B modules — about 56% of a pack at 80% SOH — are matched and rebuilt into storage systems on site.
- 4
Refined at Rotterdam, South Holland
Remaining modules are shredded to black mass and refined at Rotterdam — Maasvlakte Refining Works, 802 km away.
| Stage | Facility | Distance |
|---|---|---|
| Nearest intake yard | Dubai — Jebel Ali Logistics Yard | 4,962 km |
| Nearest grading bench | Warsaw — Mazovia Grading Centre | 838 km |
| Nearest refinery | Rotterdam — Maasvlakte Refining Works | 802 km |
Faster option
Inside the Olectra K9 Electric Bus battery
The Olectra K9 Electric Bus (2021) carries a 324 kWh LFP Prismatic (LiFePO4) pack with 22 modules at 620 V, weighing roughly 2398 kg. Cobalt-free prismatic chemistry dominant in Indian passenger EVs and commercial fleets. Low black mass value, exceptional second-life economics.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 95.5% | A — BESS ready | USD 16,875 |
| Year 4 | 92.4% | A — BESS ready | USD 16,339 |
| Year 6 | 89.3% | A — BESS ready | USD 15,803 |
| Year 8 | 86.2% | A — BESS ready | USD 15,034 |
| Year 10 | 83.1% | B — Second life | USD 12,605 |
What the chemistry means here
How it ages
LFP fades slowly and fairly linearly for most of its life. Capacity loss is driven mainly by lithium inventory being locked up in the SEI layer on the graphite anode, while the cathode structure stays largely intact.
Thermal behaviour
LFP's olivine cathode holds its oxygen tightly, so thermal runaway typically starts at higher temperatures than nickel-rich cells and releases noticeably less heat. It is not inert: a failing LFP cell still vents flammable electrolyte vapour and hydrogen, and large prismatic cans store a lot of energy in one place.
Handling LFP Prismatic
Collecting a Olectra K9 Electric Bus pack
324 kWh, 22 modules, about 2398 kg — this is how the Gothenburg, Sweden team plans the job.

Removal
Roof- or floor-mounted packs are lifted by crane or gantry with the OEM lifting frame, one string at a time.
Packaging
Packs travel as individual heavy crates on flatbed or curtain-side trailers with load restraint rated for the mass.
Consolidation
Bus packs are collected per depot and per retirement window, usually a full trailer per visit.
Before the truck arrives
- Confirm crane or gantry access and lifting frame availability
- Isolate each pack string and record its voltage
- Share pack-string serials against the bus fleet number
- Plan collection around depot operating hours
Gothenburg, Sweden site notes
- Only graded modules are accepted.
- Modules must include grade reports.
- Finished systems ship by road or sea.
- Buyer visits can be arranged.
What this pack yields
lithium
24.03 kg
nickel
0 kg
cobalt
0 kg
manganese
0 kg
copper
72.67 kg
aluminium
86.74 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in Sweden
EU Battery Regulation (EU) 2023/1542 and the Swedish battery ordinance
Regulator: Swedish Environmental Protection Agency (Naturvardsverket)
The campus operates under Swedish environmental permits and the EU Battery Regulation (EU) 2023/1542, including its rules on repurposed batteries. Systems follow applicable European safety standards.
Olectra K9 Electric Bus in Gothenburg, Sweden: common questions
Can I drop off a Olectra K9 Electric Bus battery at Gothenburg, Sweden?
Gothenburg, Sweden is a second-life bess works and does not accept whole packs from customers. Book a collection and the pack enters the network at Dubai, UAE, 4,962 km away.
What happens to Olectra K9 Electric Bus modules after Gothenburg, Sweden?
Collected via Dubai, UAE, then Graded at Warsaw, Mazovia, then Second-life build at Gothenburg, Sweden, then Refined at Rotterdam, South Holland. At 80% SOH roughly 56% of the pack goes to second life and the rest is refined.
How should a Olectra K9 Electric Bus pack be prepared for pickup?
Confirm crane or gantry access and lifting frame availability. Isolate each pack string and record its voltage. Share pack-string serials against the bus fleet number. Plan collection around depot operating hours.
Which rules apply to Olectra K9 Electric Bus recycling in Sweden?
EU Battery Regulation (EU) 2023/1542 and the Swedish battery ordinance, overseen by Swedish Environmental Protection Agency (Naturvardsverket). Road transport follows ADR, and cross-border shipments follow the EU Waste Shipment Regulation.
Cities collected by Gothenburg, Sweden
Olectra K9 Electric Bus at other sites
Other bus packs at Gothenburg, Sweden
Retiring Olectra K9 Electric Bus packs near Gothenburg, Sweden?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
