Ola Electric S1 X+ battery recycling in Monterrey, Nuevo Leon
The Ola Electric S1 X+ is not sold in this market, so packs reach Monterrey, Nuevo Leon through importers, research and test fleets or cross-border consolidation. They are accepted as whole packs, with extra checks on documentation and transboundary paperwork.
Pack value at 80% SOH
112 USD
Hybrid Split
Second-life share
56%
At 80% SOH
Site capacity
15,000 TPA
Reverse Logistics Yard
Cities served
1
From Monterrey, Nuevo Leon
Where a Ola Electric S1 X+ pack goes from Monterrey, Nuevo Leon
- 1
Intake at Monterrey, Nuevo Leon
Packs travel in UN-approved steel or plastic cages with non-conductive dividers, typically dozens per cage. Each pack is weighed, photographed and discharged below 30% state of charge.
- 2
Graded at Atlanta, Georgia
Modules travel 1,777 km to Atlanta — Georgia Grading Centre for capacity, resistance and impedance testing across all 2 modules.
- 3
Second life at Gothenburg, Sweden
At 80% SOH about 56% of the pack qualifies for reuse and goes to Gothenburg — Nordic Second-Life Campus (8,829 km). Excellent — long calendar life makes LFP the preferred feedstock for stationary BESS repurposing.
- 4
Refined at Reno, Nevada
Remaining modules are shredded to black mass and refined at Reno — Nevada Hydrometallurgy Refinery, 2,378 km away.
| Stage | Facility | Distance |
|---|---|---|
| Nearest grading bench | Atlanta — Georgia Grading Centre | 1,777 km |
| Nearest second-life works | Gothenburg — Nordic Second-Life Campus | 8,829 km |
| Nearest refinery | Reno — Nevada Hydrometallurgy Refinery | 2,378 km |
Faster option
Inside the Ola Electric S1 X+ battery
The Ola Electric S1 X+ (2024) carries a 3.5 kWh LFP Prismatic (LiFePO4) pack with 2 modules at 48 V, weighing roughly 26 kg. Cobalt-free prismatic chemistry dominant in Indian passenger EVs and commercial fleets. Low black mass value, exceptional second-life economics.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 96.3% | A — BESS ready | USD 184 |
| Year 4 | 93.2% | A — BESS ready | USD 178 |
| Year 6 | 90.1% | A — BESS ready | USD 172 |
| Year 8 | 87% | A — BESS ready | USD 166 |
| Year 10 | 83.9% | B — Second life | USD 143 |
What the chemistry means here
How it ages
LFP fades slowly and fairly linearly for most of its life. Capacity loss is driven mainly by lithium inventory being locked up in the SEI layer on the graphite anode, while the cathode structure stays largely intact.
Thermal behaviour
LFP's olivine cathode holds its oxygen tightly, so thermal runaway typically starts at higher temperatures than nickel-rich cells and releases noticeably less heat. It is not inert: a failing LFP cell still vents flammable electrolyte vapour and hydrogen, and large prismatic cans store a lot of energy in one place.
Handling LFP Prismatic
Collecting a Ola Electric S1 X+ pack
3.5 kWh, 2 modules, about 26 kg — this is how the Monterrey, Nuevo Leon team plans the job.

Removal
Removable packs are unclipped by hand; fixed packs are removed at the dealer bench with the frame supported.
Packaging
Packs travel in UN-approved steel or plastic cages with non-conductive dividers, typically dozens per cage.
Consolidation
Dealer and swap-station returns are aggregated at a single point so one collection clears many units.
Before the truck arrives
- Tape terminals and connectors on every pack
- Separate swollen or dropped packs into their own container
- Record serials in a single list per cage
- Store below 30% charge away from charging racks
Monterrey, Nuevo Leon site notes
- Cross-border shipments need permits in place well before collection.
- Plants can set up recurring scrap pickups.
- Declare chemistry and state of charge at booking.
- Damaged units are held in isolated storage.
What this pack yields
lithium
0.26 kg
nickel
0 kg
cobalt
0 kg
manganese
0 kg
copper
0.79 kg
aluminium
0.94 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in Mexico
General Law for the Prevention and Integral Management of Waste (LGPGIR)
Regulator: SEMARNAT
The yard operates under Mexican federal environmental rules administered by SEMARNAT, together with Nuevo León state requirements. Cross-border shipments need hazardous waste export authorisation and US import notification, and transport follows applicable dangerous-goods rules.
Ola Electric S1 X+ in Monterrey, Nuevo Leon: common questions
Can I drop off a Ola Electric S1 X+ battery at Monterrey, Nuevo Leon?
Yes, by appointment. Monterrey — Nuevo Leon Logistics Yard accepts whole Ola Electric S1 X+ packs; book a collection or a drop-off slot so the site can prepare packaging and paperwork.
What happens to Ola Electric S1 X+ modules after Monterrey, Nuevo Leon?
Intake at Monterrey, Nuevo Leon, then Graded at Atlanta, Georgia, then Second life at Gothenburg, Sweden, then Refined at Reno, Nevada. At 80% SOH roughly 56% of the pack goes to second life and the rest is refined.
How should a Ola Electric S1 X+ pack be prepared for pickup?
Tape terminals and connectors on every pack. Separate swollen or dropped packs into their own container. Record serials in a single list per cage. Store below 30% charge away from charging racks.
Which rules apply to Ola Electric S1 X+ recycling in Mexico?
General Law for the Prevention and Integral Management of Waste (LGPGIR), overseen by SEMARNAT. Hazardous materials transport follows SCT regulations, with lithium-ion batteries classed as Class 9.
Cities collected by Monterrey, Nuevo Leon
Ola Electric S1 X+ at other sites
Other two-wheeler packs at Monterrey, Nuevo Leon
Retiring Ola Electric S1 X+ packs near Monterrey, Nuevo Leon?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
