EVBatteryRecycling
Grading stagePassenger · LFP Prismatic

Mahindra BE 6 battery recycling in Tuas, Singapore

Tuas, Singapore is a diagnostics site: Mahindra BE 6 packs arrive here from intake yards for module-level capacity, resistance and impedance testing, which decides reuse or refining.

Pack value at 80% SOH

1,890 USD

Hybrid Split

Second-life share

56%

At 80% SOH

Site capacity

18,000 TPA

Cell Grading & Diagnostics

Cities served

1

From Tuas, Singapore

Mahindra BE 6 pack data
Route

Where a Mahindra BE 6 pack goes from Tuas, Singapore

  1. 1

    Collected via Ulsan, South Korea

    Whole packs enter the network at Ulsan — Korea Recovery Campus, 4,637 km away, where they are weighed and de-energised.

  2. 2

    Module grading at Tuas, Singapore

    All 16 modules are tested for capacity, DC resistance and impedance, then assigned grade A to D.

  3. 3

    Second life at Zwickau, Saxony

    At 80% SOH about 56% of the pack qualifies for reuse and goes to Zwickau — Saxony Second-Life Works (9,976 km). Excellent — long calendar life makes LFP the preferred feedstock for stationary BESS repurposing.

  4. 4

    Refined at Ningde, Fujian

    Remaining modules are shredded to black mass and refined at Ningde — Fujian Refining Base, 3,291 km away.

StageFacilityDistance
Nearest intake yardUlsan — Korea Recovery Campus4,637 km
Nearest second-life worksZwickau — Saxony Second-Life Works9,976 km
Nearest refineryNingde — Fujian Refining Base3,291 km
Straight-line distances from Tuas, Singapore to the next facilities in the network.

Faster option

The closest direct intake sites for Mahindra BE 6 packs are Khordha, Odisha (2,870 km) and Changsari, Assam (3,057 km).
The pack

Inside the Mahindra BE 6 battery

The Mahindra BE 6 (2025) carries a 59 kWh LFP Prismatic (LiFePO4) pack with 16 modules at 380 V, weighing roughly 437 kg. Cobalt-free prismatic chemistry dominant in Indian passenger EVs and commercial fleets. Low black mass value, exceptional second-life economics.

Service yearSOHGradeValue
Year 295.5%A — BESS readyUSD 3,073
Year 492.4%A — BESS readyUSD 2,975
Year 689.3%A — BESS readyUSD 2,878
Year 886.2%A — BESS readyUSD 2,738
Year 1083.1%B — Second lifeUSD 2,295
Modelled state of health and residual value for the Mahindra BE 6 pack.
LFP Prismatic

What the chemistry means here

01

How it ages

LFP fades slowly and fairly linearly for most of its life. Capacity loss is driven mainly by lithium inventory being locked up in the SEI layer on the graphite anode, while the cathode structure stays largely intact.

02

Thermal behaviour

LFP's olivine cathode holds its oxygen tightly, so thermal runaway typically starts at higher temperatures than nickel-rich cells and releases noticeably less heat. It is not inert: a failing LFP cell still vents flammable electrolyte vapour and hydrogen, and large prismatic cans store a lot of energy in one place.

Handling LFP Prismatic

Prismatic LFP cans are heavy and rigid: palletise them upright, restrain them against movement and keep terminals capped. Swelling is less common than in pouch cells but any bulged can goes straight to quarantine.
Passenger handling

Collecting a Mahindra BE 6 pack

59 kWh, 16 modules, about 437 kg — this is how the Tuas, Singapore team plans the job.

Removing a passenger EV battery pack for recycling
01

Removal

Packs are dropped on a vehicle lift using the OEM procedure and a rated battery table, then isolated at the service disconnect.

02

Packaging

One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed.

03

Consolidation

Dealer and workshop returns are consolidated into full truckloads, typically eight or more packs per run.

Before the truck arrives

  • Pull the service disconnect and record pack voltage
  • Drain or cap coolant lines before lifting
  • Photograph the pack casing and any impact damage
  • Keep the VIN and pack serial together on the manifest

Tuas, Singapore site notes

  • Regional shipments require import permits.
  • Provide serial lists.
  • Damaged packs need declaration.
  • Fleet pickups can be arranged.
Recovery

What this pack yields

lithium

4.38 kg

nickel

0 kg

cobalt

0 kg

manganese

0 kg

copper

13.23 kg

aluminium

15.8 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in Singapore

Resource Sustainability Act 2019 and the Environmental Protection and Management Act

Regulator: National Environment Agency (NEA)

The hub operates under Singapore National Environment Agency requirements, including its producer responsibility scheme for e-waste. International shipments follow Basel Convention procedures where applicable.

FAQ

Mahindra BE 6 in Tuas, Singapore: common questions

Can I drop off a Mahindra BE 6 battery at Tuas, Singapore?

Tuas, Singapore is a cell grading & diagnostics and does not accept whole packs from customers. Book a collection and the pack enters the network at Ulsan, South Korea, 4,637 km away.

What happens to Mahindra BE 6 modules after Tuas, Singapore?

Collected via Ulsan, South Korea, then Module grading at Tuas, Singapore, then Second life at Zwickau, Saxony, then Refined at Ningde, Fujian. At 80% SOH roughly 56% of the pack goes to second life and the rest is refined.

How should a Mahindra BE 6 pack be prepared for pickup?

Pull the service disconnect and record pack voltage. Drain or cap coolant lines before lifting. Photograph the pack casing and any impact damage. Keep the VIN and pack serial together on the manifest.

Which rules apply to Mahindra BE 6 recycling in Singapore?

Resource Sustainability Act 2019 and the Environmental Protection and Management Act, overseen by National Environment Agency (NEA). Dangerous goods movements follow SCDF and MPA requirements, with frequent sea transhipment under the IMDG Code.

Coverage

Cities collected by Tuas, Singapore

Retiring Mahindra BE 6 packs near Tuas, Singapore?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.