EVBatteryRecycling
Grading stagePassenger · NMC 811 (2170)

Kia EV6 GT-Line battery recycling in Birmingham, England

Birmingham, England is a diagnostics site: Kia EV6 GT-Line packs arrive here from intake yards for module-level capacity, resistance and impedance testing, which decides reuse or refining.

Pack value at 80% SOH

3,628 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

16,000 TPA

Cell Grading & Diagnostics

Cities served

3

From Birmingham, England

Kia EV6 GT-Line pack data
Route

Where a Kia EV6 GT-Line pack goes from Birmingham, England

  1. 1

    Collected via Toronto, Ontario

    Whole packs enter the network at Toronto — Ontario Recovery Campus, 5,558 km away, where they are weighed and de-energised.

  2. 2

    Module grading at Birmingham, England

    All 32 modules are tested for capacity, DC resistance and impedance, then assigned grade A to D.

  3. 3

    Second life at Zwickau, Saxony

    At 80% SOH about 47% of the pack qualifies for reuse and goes to Zwickau — Saxony Second-Life Works (1,011 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.

  4. 4

    Refined at Rotterdam, South Holland

    Remaining modules are shredded to black mass and refined at Rotterdam — Maasvlakte Refining Works, 439 km away.

StageFacilityDistance
Nearest intake yardToronto — Ontario Recovery Campus5,558 km
Nearest second-life worksZwickau — Saxony Second-Life Works1,011 km
Nearest refineryRotterdam — Maasvlakte Refining Works439 km
Straight-line distances from Birmingham, England to the next facilities in the network.

Faster option

The closest direct intake sites for Kia EV6 GT-Line packs are Toronto, Ontario (5,558 km) and Dubai, UAE (5,612 km).
The pack

Inside the Kia EV6 GT-Line battery

The Kia EV6 GT-Line (2022) carries a 77.4 kWh NMC 811 Cylindrical 2170 pack with 32 modules at 697 V, weighing roughly 433 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.

Service yearSOHGradeValue
Year 294.3%A — BESS readyUSD 4,828
Year 490%A — BESS readyUSD 4,636
Year 685.7%A — BESS readyUSD 4,357
Year 881.4%B — Second lifeUSD 3,791
Year 1077.1%B — Second lifeUSD 3,325
Modelled state of health and residual value for the Kia EV6 GT-Line pack.
NMC 811 (2170)

What the chemistry means here

01

How it ages

NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.

02

Thermal behaviour

High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.

Handling NMC 811 (2170)

Cylindrical modules are dense and often liquid-cooled: drain and cap coolant lines, check for coolant ingress, and keep modules below 30% state of charge for storage and transport.
Passenger handling

Collecting a Kia EV6 GT-Line pack

77.4 kWh, 32 modules, about 433 kg — this is how the Birmingham, England team plans the job.

Removing a passenger EV battery pack for recycling
01

Removal

Packs are dropped on a vehicle lift using the OEM procedure and a rated battery table, then isolated at the service disconnect.

02

Packaging

One pack per UN-rated pallet box, strapped and restrained, with terminals capped and coolant ports sealed.

03

Consolidation

Dealer and workshop returns are consolidated into full truckloads, typically eight or more packs per run.

Before the truck arrives

  • Pull the service disconnect and record pack voltage
  • Drain or cap coolant lines before lifting
  • Photograph the pack casing and any impact damage
  • Keep the VIN and pack serial together on the manifest

Birmingham, England site notes

  • Dismantlers should secure packs before collection.
  • Fleet operators can book depot pickups.
  • Development packs require architecture details.
  • Damaged packs need prior declaration.
Recovery

What this pack yields

lithium

4.4 kg

nickel

28.43 kg

cobalt

3.52 kg

manganese

3.27 kg

copper

14.09 kg

aluminium

11.83 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in United Kingdom

Waste Batteries and Accumulators Regulations 2009

Regulator: Environment Agency and devolved regulators, with OPSS on market placement

The works operates under Environment Agency permitting in England and the UK waste batteries regulations, which place producer responsibility obligations on those placing batteries on the market. Transport follows UK dangerous goods rules based on ADR.

FAQ

Kia EV6 GT-Line in Birmingham, England: common questions

Can I drop off a Kia EV6 GT-Line battery at Birmingham, England?

Birmingham, England is a cell grading & diagnostics and does not accept whole packs from customers. Book a collection and the pack enters the network at Toronto, Ontario, 5,558 km away.

What happens to Kia EV6 GT-Line modules after Birmingham, England?

Collected via Toronto, Ontario, then Module grading at Birmingham, England, then Second life at Zwickau, Saxony, then Refined at Rotterdam, South Holland. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Kia EV6 GT-Line pack be prepared for pickup?

Pull the service disconnect and record pack voltage. Drain or cap coolant lines before lifting. Photograph the pack casing and any impact damage. Keep the VIN and pack serial together on the manifest.

Which rules apply to Kia EV6 GT-Line recycling in United Kingdom?

Waste Batteries and Accumulators Regulations 2009, overseen by Environment Agency and devolved regulators, with OPSS on market placement. Road transport follows ADR through the Carriage of Dangerous Goods Regulations, and exports need waste shipment approval.

Coverage

Cities collected by Birmingham, England

Retiring Kia EV6 GT-Line packs near Birmingham, England?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.