Ford F-150 Lightning ER battery recycling in Detroit, Michigan

Detroit — Michigan Closed-Loop Plant takes whole Ford F-150 Lightning ER packs straight from fleets, dealers and workshops. Packs are weighed, de-energised and logged here before modules move on for grading or refining.

Pack value at 80% SOH

6,140 USD

Hybrid Split

Second-life share

47%

At 80% SOH

Site capacity

40,000 TPA

Integrated Recovery Campus

Cities served

10

From Detroit, Michigan

Ford F-150 Lightning ER pack data
Route

Where a Ford F-150 Lightning ER pack goes from Detroit, Michigan

  1. 1

    Intake at Detroit, Michigan

    Each pack travels in a rated crate or on a restrained pallet, with coolant drained and ports sealed. Each pack is weighed, photographed and discharged below 30% state of charge.

  2. 2

    Graded at Atlanta, Georgia

    Modules travel 961 km to Atlanta — Georgia Grading Centre for capacity, resistance and impedance testing across all 16 modules.

  3. 3

    Second life at Gothenburg, Sweden

    At 80% SOH about 47% of the pack qualifies for reuse and goes to Gothenburg — Nordic Second-Life Campus (6,413 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.

  4. 4

    Refined at Reno, Nevada

    Remaining modules are shredded to black mass and refined at Reno — Nevada Hydrometallurgy Refinery, 3,080 km away.

StageFacilityDistance
Nearest grading benchAtlanta — Georgia Grading Centre961 km
Nearest second-life worksGothenburg — Nordic Second-Life Campus6,413 km
Nearest refineryReno — Nevada Hydrometallurgy Refinery3,080 km
Straight-line distances from Detroit, Michigan to the next facilities in the network.
The pack

Inside the Ford F-150 Lightning ER battery

The Ford F-150 Lightning ER (2022) carries a 131 kWh NMC 811 Cylindrical 2170 pack with 16 modules at 400 V, weighing roughly 734 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.

Service yearSOHGradeValue
Year 295.6%A — BESS readyUSD 8,271
Year 491.3%A — BESS readyUSD 7,945
Year 687%A — BESS readyUSD 7,619
Year 882.7%B — Second lifeUSD 6,687
Year 1078.4%B — Second lifeUSD 5,847
Modelled state of health and residual value for the Ford F-150 Lightning ER pack.
NMC 811 (2170)

What the chemistry means here

01

How it ages

NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.

02

Thermal behaviour

High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.

Handling NMC 811 (2170)

Cylindrical modules are dense and often liquid-cooled: drain and cap coolant lines, check for coolant ingress, and keep modules below 30% state of charge for storage and transport.
Commercial Fleet handling

Collecting a Ford F-150 Lightning ER pack

131 kWh, 16 modules, about 734 kg — this is how the Detroit, Michigan team plans the job.

Removing a commercial fleet EV battery pack for recycling
01

Removal

Large packs are removed at the depot with a forklift-rated battery table and the vehicle isolated under lock-out tag-out.

02

Packaging

Each pack travels in a rated crate or on a restrained pallet, with coolant drained and ports sealed.

03

Consolidation

Depot retirements are batched against the fleet replacement schedule so collections line up with vehicle swaps.

Before the truck arrives

  • Share telematics SOH history if it is available
  • Confirm forklift access and dock height at the depot
  • Isolate high-voltage systems under lock-out tag-out
  • Declare any pack involved in a collision

Detroit, Michigan site notes

  • Send architecture drawings or a disassembly note with prototype packs so the right procedure is prepared.
  • Engineering centres can book recurring collections for validation and test waste.
  • Damaged, defective or recalled units must be declared so they ship under the correct DOT provisions.
  • Truck and large commercial packs need advance notice so rigging and crew are scheduled.
Recovery

What this pack yields

lithium

7.45 kg

nickel

48.13 kg

cobalt

5.96 kg

manganese

5.54 kg

copper

23.85 kg

aluminium

20.02 kg

Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.

Compliance

Rules in United States

EPA universal waste rules, DOT hazardous materials regulations and state programmes

Regulator: EPA, DOT PHMSA and state environmental agencies

The campus operates under permits administered by Michigan's Department of Environment, Great Lakes, and Energy (EGLE), and manages spent lithium-ion batteries under the US EPA universal waste framework where it applies. Transport follows US DOT hazardous materials regulations for lithium batteries, including the separate provisions for damaged, defective or recalled cells.

FAQ

Ford F-150 Lightning ER in Detroit, Michigan: common questions

Can I drop off a Ford F-150 Lightning ER battery at Detroit, Michigan?

Yes, by appointment. Detroit — Michigan Closed-Loop Plant accepts whole Ford F-150 Lightning ER packs; book a collection or a drop-off slot so the site can prepare packaging and paperwork.

What happens to Ford F-150 Lightning ER modules after Detroit, Michigan?

Intake at Detroit, Michigan, then Graded at Atlanta, Georgia, then Second life at Gothenburg, Sweden, then Refined at Reno, Nevada. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.

How should a Ford F-150 Lightning ER pack be prepared for pickup?

Share telematics SOH history if it is available. Confirm forklift access and dock height at the depot. Isolate high-voltage systems under lock-out tag-out. Declare any pack involved in a collision.

Which rules apply to Ford F-150 Lightning ER recycling in United States?

EPA universal waste rules, DOT hazardous materials regulations and state programmes, overseen by EPA, DOT PHMSA and state environmental agencies. Shipments follow DOT PHMSA 49 CFR requirements, with damaged or defective batteries under stricter special permits and packaging.

Coverage

Cities collected by Detroit, Michigan

Retiring Ford F-150 Lightning ER packs near Detroit, Michigan?

Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.