EVBatteryRecycling
Cell Grading & DiagnosticsUnited States · 37.55 N, 121.99 W

Fremont — California Diagnostics Works

Fremont, California facility: diagnostics centre running module-level SOH, impedance and optical grading to split reuse from refining. Rated at 24,000 tonnes per annum and operating since 2020.

+91 96731 98867
Industrial and EV landscape in California

Annual capacity

24,000 TPA

Operating lines

3

Cities collected

0

In operation since

2020

The site

About the Fremont, California facility

Fremont sits in the southern East Bay, part of a Bay Area cluster that combines vehicle production, battery start-ups and energy storage developers. The diagnostics works opened on Fremont Boulevard in 2020 to grade packs from California, the largest EV market in the United States, where many of the earliest mass-market electric cars are now reaching the end of their road life.

With 24,000 TPA of capacity, the works tests large volumes of passenger-car packs from dismantlers, dealers and fleets. Its location also suits pilot-line and R&D material from Bay Area companies developing new cells and packs, while Grade A modules find a ready market in California's strong demand for energy storage. Dismantlers are a large and steady source of the site's intake, bringing packs already removed from vehicles.

What arrives at the gate

Passenger-car packs from California's large EV fleetPilot-line and R&D material from Bay Area companiesRide-hailing and delivery fleet retirementsPacks removed from vehicles at licensed dismantlers
Capabilities

What sets this site apart

01

Largest US EV market

Serves California, where many of the first mass-market EVs are now retiring.

02

R&D material handling

Accepts experimental cells and packs from local technology developers.

03

Storage-market supply

Grade A modules feed California's strong demand for energy storage.

On site

What happens to material here

Exterior of a battery cell grading and diagnostics centreBattery modules on cycler racks for state-of-health testingImpedance testing of a retired EV battery module
  1. 1

    Intake & safety triage

    Packs are logged, thermally imaged and screened for swelling, coolant ingress or venting before entering the bench area.

  2. 2

    Controlled de-energising

    Residual energy is discharged to a safe state of charge with regenerative load banks and recorded per serial number.

  3. 3

    Module-level capacity test

    Full charge-discharge cycling at C/3 establishes usable capacity, internal resistance and cell-to-cell balance.

  4. 4

    EIS fingerprinting

    1 mHz–10 kHz impedance sweeps separate SEI growth, lithium plating and contact resistance degradation modes.

  5. 5

    AI optical inspection

    Machine-vision inspection of busbars, welds and cell cans flags mechanical defects that block second-life reuse.

  6. 6

    Grade assignment

    Grade A (≥85% SOH), B (75–85%), C (65–75%) and D routes are assigned, with D-grade material released to refining.

Technical specification for this plant →
Network

Where material goes next

RoleFacilityDistance
Second-Life BESS WorksGothenburg — Nordic Second-Life Campus8,586 km
Hydrometallurgical RefineryReno — Nevada Hydrometallurgy Refinery291 km
Integrated Recovery CampusDetroit — Michigan Closed-Loop Plant3,332 km
Nearest specialist facilities to Fremont, California (straight-line distance).

Local rules

EPA universal waste rules, DOT hazardous materials regulations and state programmes · EPA, DOT PHMSA and state environmental agencies

The works operates under California's demanding hazardous-waste regime, overseen by the Department of Toxic Substances Control, alongside local permitting. California has also legislated towards producer responsibility for EV batteries, so records are kept in a form that supports evolving requirements. Transport follows US DOT hazardous materials rules.

Booking

Before you book into Fremont, California

  • Experimental cells must be declared with chemistry and any known hazards.
  • Dismantlers should remove and secure packs before the collection vehicle arrives.
  • Include VINs or serial numbers to support California record-keeping.
  • Damaged packs require advance notice and ship under separate paperwork.

Reverse logistics

Book a slot at Fremont, California

The Fremont, California despatch desk confirms your pickup window within one working day and ships UN-approved packaging before collection.

Reply within one working day.

Damaged or defective packs are handled under a separate quarantine protocol — flag them in the form and the team calls you back the same day.

FAQ

Fremont, California site: common questions

Does Fremont accept prototype cells?

Yes, with a declaration of chemistry and known hazards so they can be handled safely.

Why is Fremont's documentation so detailed?

California applies demanding hazardous-waste rules, so complete records are kept for every consignment.

What are the opening hours at Fremont, California?

Monday to Friday 08:00 – 20:00, Saturday 08:00 – 16:00. Sunday: emergency and damaged-pack intake only, by prior booking.

How do I book a collection into Fremont, California?

Use the booking button on this page with pack counts, chemistry and condition. The despatch desk confirms a window within one working day and ships UN-approved packaging before collection.