Switch Mobility EiV 12 City Bus battery recycling in Dubai, UAE
Dubai — Jebel Ali Logistics Yard takes whole Switch Mobility EiV 12 City Bus packs straight from fleets, dealers and workshops. Packs are weighed, de-energised and logged here before modules move on for grading or refining.
Pack value at 80% SOH
11,209 USD
Hybrid Split
Second-life share
56%
At 80% SOH
Site capacity
14,000 TPA
Reverse Logistics Yard
Cities served
1
From Dubai, UAE
Where a Switch Mobility EiV 12 City Bus pack goes from Dubai, UAE
- 1
Intake at Dubai, UAE
Packs travel as individual heavy crates on flatbed or curtain-side trailers with load restraint rated for the mass. Each pack is weighed, photographed and discharged below 30% state of charge.
- 2
Graded at Warsaw, Mazovia
Modules travel 4,157 km to Warsaw — Mazovia Grading Centre for capacity, resistance and impedance testing across all 24 modules.
- 3
Second life at Zwickau, Saxony
At 80% SOH about 56% of the pack qualifies for reuse and goes to Zwickau — Saxony Second-Life Works (4,604 km). Excellent — long calendar life makes LFP the preferred feedstock for stationary BESS repurposing.
- 4
Refined at Lyon, France
Remaining modules are shredded to black mass and refined at Lyon — Auvergne-Rhone-Alpes Refinery, 5,003 km away.
| Stage | Facility | Distance |
|---|---|---|
| Nearest grading bench | Warsaw — Mazovia Grading Centre | 4,157 km |
| Nearest second-life works | Zwickau — Saxony Second-Life Works | 4,604 km |
| Nearest refinery | Lyon — Auvergne-Rhone-Alpes Refinery | 5,003 km |
Inside the Switch Mobility EiV 12 City Bus battery
The Switch Mobility EiV 12 City Bus (2022) carries a 350 kWh LFP Prismatic (LiFePO4) pack with 24 modules at 640 V, weighing roughly 2590 kg. Cobalt-free prismatic chemistry dominant in Indian passenger EVs and commercial fleets. Low black mass value, exceptional second-life economics.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 96.4% | A — BESS ready | USD 18,397 |
| Year 4 | 93.3% | A — BESS ready | USD 17,818 |
| Year 6 | 90.2% | A — BESS ready | USD 17,239 |
| Year 8 | 87.1% | A — BESS ready | USD 16,660 |
| Year 10 | 84% | B — Second life | USD 14,356 |
What the chemistry means here
How it ages
LFP fades slowly and fairly linearly for most of its life. Capacity loss is driven mainly by lithium inventory being locked up in the SEI layer on the graphite anode, while the cathode structure stays largely intact.
Thermal behaviour
LFP's olivine cathode holds its oxygen tightly, so thermal runaway typically starts at higher temperatures than nickel-rich cells and releases noticeably less heat. It is not inert: a failing LFP cell still vents flammable electrolyte vapour and hydrogen, and large prismatic cans store a lot of energy in one place.
Handling LFP Prismatic
Collecting a Switch Mobility EiV 12 City Bus pack
350 kWh, 24 modules, about 2590 kg — this is how the Dubai, UAE team plans the job.

Removal
Roof- or floor-mounted packs are lifted by crane or gantry with the OEM lifting frame, one string at a time.
Packaging
Packs travel as individual heavy crates on flatbed or curtain-side trailers with load restraint rated for the mass.
Consolidation
Bus packs are collected per depot and per retirement window, usually a full trailer per visit.
Before the truck arrives
- Confirm crane or gantry access and lifting frame availability
- Isolate each pack string and record its voltage
- Share pack-string serials against the bus fleet number
- Plan collection around depot operating hours
Dubai, UAE site notes
- Collections are scheduled to avoid peak heat.
- Export shipments need prior approvals.
- Declare damage in advance.
- Packs are kept in cooled storage.
What this pack yields
lithium
25.96 kg
nickel
0 kg
cobalt
0 kg
manganese
0 kg
copper
78.51 kg
aluminium
93.7 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in United Arab Emirates
Federal Law No. 12 of 2018 on Integrated Waste Management
Regulator: Ministry of Climate Change and Environment, with emirate-level authorities
The yard operates under UAE federal and Dubai environmental rules and free zone requirements. International shipments follow applicable waste and dangerous goods rules, including Basel Convention procedures where relevant.
Switch Mobility EiV 12 City Bus in Dubai, UAE: common questions
Can I drop off a Switch Mobility EiV 12 City Bus battery at Dubai, UAE?
Yes, by appointment. Dubai — Jebel Ali Logistics Yard accepts whole Switch Mobility EiV 12 City Bus packs; book a collection or a drop-off slot so the site can prepare packaging and paperwork.
What happens to Switch Mobility EiV 12 City Bus modules after Dubai, UAE?
Intake at Dubai, UAE, then Graded at Warsaw, Mazovia, then Second life at Zwickau, Saxony, then Refined at Lyon, France. At 80% SOH roughly 56% of the pack goes to second life and the rest is refined.
How should a Switch Mobility EiV 12 City Bus pack be prepared for pickup?
Confirm crane or gantry access and lifting frame availability. Isolate each pack string and record its voltage. Share pack-string serials against the bus fleet number. Plan collection around depot operating hours.
Which rules apply to Switch Mobility EiV 12 City Bus recycling in United Arab Emirates?
Federal Law No. 12 of 2018 on Integrated Waste Management, overseen by Ministry of Climate Change and Environment, with emirate-level authorities. Dangerous goods transport follows federal and emirate rules, with frequent re-export by sea through Jebel Ali.
Cities collected by Dubai, UAE
Switch Mobility EiV 12 City Bus at other sites
Other bus packs at Dubai, UAE
Retiring Switch Mobility EiV 12 City Bus packs near Dubai, UAE?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
