Hero Vida V1 Pro battery recycling in Tuas, Singapore
Tuas, Singapore is a diagnostics site: Hero Vida V1 Pro packs arrive here from intake yards for module-level capacity, resistance and impedance testing, which decides reuse or refining.
Pack value at 80% SOH
185 USD
Hybrid Split
Second-life share
47%
At 80% SOH
Site capacity
18,000 TPA
Cell Grading & Diagnostics
Cities served
1
From Tuas, Singapore
Where a Hero Vida V1 Pro pack goes from Tuas, Singapore
- 1
Collected via Ulsan, South Korea
Whole packs enter the network at Ulsan — Korea Recovery Campus, 4,637 km away, where they are weighed and de-energised.
- 2
Module grading at Tuas, Singapore
All 2 modules are tested for capacity, DC resistance and impedance, then assigned grade A to D.
- 3
Second life at Zwickau, Saxony
At 80% SOH about 47% of the pack qualifies for reuse and goes to Zwickau — Saxony Second-Life Works (9,976 km). Good — grade-A modules above 80% SOH qualify for commercial-scale BESS strings.
- 4
Refined at Ningde, Fujian
Remaining modules are shredded to black mass and refined at Ningde — Fujian Refining Base, 3,291 km away.
| Stage | Facility | Distance |
|---|---|---|
| Nearest intake yard | Ulsan — Korea Recovery Campus | 4,637 km |
| Nearest second-life works | Zwickau — Saxony Second-Life Works | 9,976 km |
| Nearest refinery | Ningde — Fujian Refining Base | 3,291 km |
Faster option
Inside the Hero Vida V1 Pro battery
The Hero Vida V1 Pro (2023) carries a 3.94 kWh NMC 811 Cylindrical 2170 pack with 2 modules at 51 V, weighing roughly 22 kg. High-nickel cylindrical cells with the strongest hydrometallurgical recovery credit per tonne of black mass.
| Service year | SOH | Grade | Value |
|---|---|---|---|
| Year 2 | 95% | A — BESS ready | USD 247 |
| Year 4 | 90.7% | A — BESS ready | USD 238 |
| Year 6 | 86.4% | A — BESS ready | USD 227 |
| Year 8 | 82.1% | B — Second life | USD 197 |
| Year 10 | 77.8% | B — Second life | USD 173 |
What the chemistry means here
How it ages
NMC 811 loses capacity through a mix of SEI growth, cathode surface reconstruction and micro-cracking of nickel-rich particles. Resistance climbs faster than in LFP, which matters as much as capacity for second-life duty.
Thermal behaviour
High-nickel NMC cathodes release oxygen as they decompose, so once runaway starts it is fast and energetic. Cylindrical 2170 cells vent through a designed rupture point, which helps, but cell-to-cell propagation inside a tightly packed module is the main hazard.
Handling NMC 811 (2170)
Collecting a Hero Vida V1 Pro pack
3.94 kWh, 2 modules, about 22 kg — this is how the Tuas, Singapore team plans the job.

Removal
Removable packs are unclipped by hand; fixed packs are removed at the dealer bench with the frame supported.
Packaging
Packs travel in UN-approved steel or plastic cages with non-conductive dividers, typically dozens per cage.
Consolidation
Dealer and swap-station returns are aggregated at a single point so one collection clears many units.
Before the truck arrives
- Tape terminals and connectors on every pack
- Separate swollen or dropped packs into their own container
- Record serials in a single list per cage
- Store below 30% charge away from charging racks
Tuas, Singapore site notes
- Regional shipments require import permits.
- Provide serial lists.
- Damaged packs need declaration.
- Fleet pickups can be arranged.
What this pack yields
lithium
0.22 kg
nickel
1.45 kg
cobalt
0.18 kg
manganese
0.17 kg
copper
0.72 kg
aluminium
0.6 kg
Refining-route estimate at 80% SOH. Measured module health on the bench sets the final split.
Rules in Singapore
Resource Sustainability Act 2019 and the Environmental Protection and Management Act
Regulator: National Environment Agency (NEA)
The hub operates under Singapore National Environment Agency requirements, including its producer responsibility scheme for e-waste. International shipments follow Basel Convention procedures where applicable.
Hero Vida V1 Pro in Tuas, Singapore: common questions
Can I drop off a Hero Vida V1 Pro battery at Tuas, Singapore?
Tuas, Singapore is a cell grading & diagnostics and does not accept whole packs from customers. Book a collection and the pack enters the network at Ulsan, South Korea, 4,637 km away.
What happens to Hero Vida V1 Pro modules after Tuas, Singapore?
Collected via Ulsan, South Korea, then Module grading at Tuas, Singapore, then Second life at Zwickau, Saxony, then Refined at Ningde, Fujian. At 80% SOH roughly 47% of the pack goes to second life and the rest is refined.
How should a Hero Vida V1 Pro pack be prepared for pickup?
Tape terminals and connectors on every pack. Separate swollen or dropped packs into their own container. Record serials in a single list per cage. Store below 30% charge away from charging racks.
Which rules apply to Hero Vida V1 Pro recycling in Singapore?
Resource Sustainability Act 2019 and the Environmental Protection and Management Act, overseen by National Environment Agency (NEA). Dangerous goods movements follow SCDF and MPA requirements, with frequent sea transhipment under the IMDG Code.
Cities collected by Tuas, Singapore
Hero Vida V1 Pro at other sites
Other two-wheeler packs at Tuas, Singapore
Retiring Hero Vida V1 Pro packs near Tuas, Singapore?
Share pack counts and condition. The despatch desk confirms a collection window within one working day and sends the right packaging.
